2010 AIAMI EDUCATIONAL FACILITIES CONFERENCE

BUILDING INFORMATION MODELING


FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


What is BIM?
What are the Advantages?
How can BIM work for you?

INTRODUCTION

BIM FOR K-12 FACILITIES


INTRODUCTION :: QUESTION
What is your role
in educational facilities?

1. Architect, Engineer,
Designer
2. Constructor
3. Owner/Operator /
Administrator
4. Facility manager
5. Educational Leader
6. Other?

BIM FOR K-12 FACILITIES


INTRODUCTION :: QUESTION
How Many Facilities
are in your district?

1. 1-5
2. 6-14
3. 15-40
4. More

BIM FOR K-12 FACILITIES


A TECHNOLOGY
A PROCESS
A GAME-CHANGER

WHAT IS BIM?

BIM FOR K-12 FACILITIES


I is for Information
Relational
3D?
CAD?

BIM IS: A TECHNOLOGY

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: INFORMATION

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: RELATIONAL

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: RELATIONAL

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: RELATIONAL
Relational data allows coordination,
and discovery
of relationships

allows us to take multiple pieces of Information and cross reference them, making
connections, finding correlations between content and criteria that inform design
decisions and streamline coordination.

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: PARAMETRIC
In statistics, a parametric model or parametric family or finite-dimensional model is a family of
distributions that can be described using a finite number of parameters. These parameters are
usually collected together to form a single k-dimensional parameter vector θ = (θ1, θ2, …, θk).

In 3D Software, Parametric means that the Data drives the Form, a reversed relationship from the idea
of sculpting, or traditional architecture.

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: PARAMETRIC
Parametric Modeling produces very functional traditional objects

And allows complex data to be used to create solutions to complex problems, or interesting forms.

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: 3D
IS BIM 3D?
Not Necessarily, but a Building is 3D, so it’s likely that 3D
information is stored in the information Model.
If not 3D, What is BIM?
• Constraints
• Relationships
• Organizational Structure
• “Parametric”
3D Models, and 2D Drawings are a common side-
effect of a BIM

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: 1D, 2D, 3D, 4D +

2D
1D
BIM
Database

3D Drawing Sheets

4D..
Graphics
Ideas

data
3D+ - Cost
Time, Etc.

Rapid Live motion


Proto-typing visualizations
Visualization

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: 3D
Integrating Information from
Multiple Sources
2D Construction / Finite Element
Analysis Consolidated Information =
Bid Documents
Energy Analysis better Database
Green Building Studio

Interior CFD
VRML & Comfort Levels
walkthroughs
Exterior CFD Construction Phasing
3D Massing Airflow Analysis & Scheduling Visualization
And Analysis
Automated
LEED Scheduling Rendering
Visualization

Rapid Prototyping

Solar Radiation BIM Clash Detection


& 3D Coordination
Studies Revit model

Weather
Envelope / Artificial Lighting Analysis
Site Analysis
Daylighting Analysis

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: LIKE CAD?
Same Goals
Same Start Point
Same Endpoint
Very different path

IDEA / CONSTRUCTED
CONCEPT FACILITY

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: LIKE CAD?

 Concepts &Definitions
 Drafting:
 Simple,

 Reliable,

 Easy to understand  Slow


 Easy to fix  Inaccurate
 Simple to maintain  Representational

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: LIKE CAD?

 Concepts &Definitions
 CAD:
 Simple,

 Reliable,  Less Slow


 Less Easy to understand  Less Inaccurate
 Less Easy to fix  Representational
 Less Simple to maintain  Same Concept… better
technology.

BIM FOR K-12 FACILITIES


BIM :: TECHNOLOGY :: LIKE CAD?

CONSTRUCTED
CONCEPT

FACILITY
IDEA /
 Concepts &Definitions
 BIM
 Goals are the same, Different technology

 End results are similar, Different path

 Much greater capacity for speed and volume

 Doesn’t drive the same way.

BIM FOR K-12 FACILITIES


BIM @ URS :: CONCEPTS
Concepts &Definitions
BIM
Who will pilot the
development of the
Information Model?

There are consequences


to letting
inexperienced/untrained
users steer..

BIM FOR K-12 FACILITIES


BIM IS: A PROCESS

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: COLLABORATIVE

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: COLLABORATIVE
Design work shops Design work shops
how
VE Design work shops BIM work shops

OPTION B

landscape

OPTION 1
BIM work shops

design
OPTION 2

planning OPTION 3
OPTION A

OPTION 4

way finding

planning

BIM work shops


design

start /context /concepts /ideas/options/evolution /solution/sustain/finish

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: COLLABORATIVE
Integrating Information from
Multiple Sources

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: COLLABORATIVE
Integrating Information from
Multiple Sources
Consolidated Information =
better Database

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: HOLISTIC
Integrating as much information as possible into a
single, coordinated database.

Informing design Decisions

Capturing Intentions and Values

Measuring Solutions

BIM
information

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: HOLISTIC :: INFORMING THE PROCESS

VRML
walkthroughs Finite Element
3D Massing Analysis Construction Phasing
And Analysis & Scheduling Visualization
Energy Analysis
Green Building Studio
Laser Scanning

Rapid Prototyping Solar Radiation


Clash Detection
Studies
& 3D Coordination
Automated
LEED Scheduling
Rendering
Visualization
Artificial Lighting Analysis
Weather
Envelope / Daylighting Analysis
Site Analysis Exterior CFD
Airflow Analysis Interior CFD
& Comfort Levels

Ideas/Sketches/Tests/Validation/Revisions/Refinements/Solutions

BIM FOR K-12 FACILITIES


Aspirations.. “what do we want the school to be”
Formal
Design Intent/ Client Buy-

Study
Investigati

Model
In

Design/
on

Construction 2D Plots /

Files
Draft/
Model
Documents DWF / PDF

Light Levels Design Validation,


Analysis

Analysis
Code Compliance

Lighting

software
Model
Structural Validation

Analysis
Structural
BIM :: PROCESS :: HOLISTIC :: PRE BIM

3D Renderings, Design Intent/


tion
Model Material Studies, Client Buy-In,
Visualiza

Animations/Video Fundraising

Code
Data
Com-
Check

Compliance/
Approval

Carbon Load, Operational Design Validation,


Code
Model
Energy

Costs, System Sizing, LEED


Analysis

Compliance/
Documentation Approval, LEED
BIM FOR K-12 FACILITIES
BIM :: PROCESS :: HOLISTIC :: CONSOLIDATION

Construction Documents
•Accurate, Synchronized
•3D Information
•Staging/Scheduling
•Clash Detection
•Shop Drawing Verification

Renderings
Delivery •Design Intent
•IFC •Client Buy-In
•Facilities Management •Public Support
•Fundraising

BIM
Revit model

Database Plug-ins
•Structural Validation QTO
•Energy Modeling
•Live Costs/ Quantities
•System Sizing
•Design Analysis

GBXML
•Energy Model
•Lighting Levels
•Comcheck

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: HOLISTIC
Integrating Information from
Multiple Sources
Consolidated Information =
better Database

Delivery

Construction
Documents

Renderings

BIM QTO
Revit model

Analysis
Data
Extensions

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: ITERATIVE

Requirements Analysis & Design

Planning Implementation

Initial
Planning
Deployment

Evaluation Testing

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: FRONT-LOADED
•All Hands
•Define Parameters, Goals
Kickoff •Define success for the phase

•Team Requirements

1
•Design Goals
•Evaluate/Steer
Round

•Team Requirements

2
•Design Goals
•Evaluate/Steer
Round

•Team Requirements

3
•Design Goals
•Evaluate/Steer
Round

•Team Requirements
•Design Goals
QC •Evaluate/Steer

•All Hands
•Prep for next phase
Closeout

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: ITERATIVE :: DIVERGENCE/GOALS
Not more meetings…
more information transfer

Not more drawings…


richer discussions

Phase/Effort/Focus

Way points, Collaboration


sessions, Contact

Data points, steering


opportunities

All-Hands, Review, Goals and


limitations

Individual design solution


progress/direction

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: ITERATIVE ::
Not more meetings…
more information transfer

Not more drawings…


richer discussions

More integrated and


frequent contact reduces
the time individual
designers and disciplines
spend developing
potentially divergent
strategies.

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: ITERATIVE :: TIME & ENERGY SAVINGS
Not more meetings…
more information transfer

Not more drawings…


richer discussions

More integrated and


frequent contact reduces
the time spent
developing potentially
divergent strategies.

Integrated Modeling and


design can create more
focus, and reduce lost
time, increasing
efficiency.

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: FRONT-LOADED
If This is good because
Drawings, Documents Good Data makes good
are side effects of a design
well-constructed
Building Information Early Data means more
Database informed decisions
Then
Building the database Early Data = Opportunity
has to come first. for early analysis.
So
Database Development
Precedes traditional
output.

BIM FOR K-12 FACILITIES


OPERATIONS :: CHANGES :: CONTRACTS & BILLING

BIM FOR K-12 FACILITIES


OPERATIONS :: CHANGES :: CONTRACTS & BILLING

BIM FOR K-12 FACILITIES


OPERATIONS :: CHANGES :: CONTRACTS & BILLING

BIM FOR K-12 FACILITIES


OPERATIONS :: CHANGES :: CONTRACTS & BILLING

BIM FOR K-12 FACILITIES


OPERATIONS :: CHANGES :: CONTRACTS & BILLING

BIM FOR K-12 FACILITIES


BIM :: PROCESS :: IPD
IPD = Integrated Project Delivery
Owner
/Operator
Leverage the benefits of BIM (district)

IPD IS NOT BIM Integrated


Contract
Constructors Designers
Nor is BIM IPD (Contractor, (Architects,
CM, GC) Engineers

Shared Risk
Collaborative Design
Shared Reward
Project Savings
performance goals

BIM FOR K-12 FACILITIES


A GAME-CHANGER

BIM FOR K-12 FACILITIES


BIM :: GAME CHANGER
BIM AFFECTS NEARLY EVERY ASPECT OF THE
FACILITY DESIGN AND CONSTRUCTINO PROCESS.

CONTRACTS
BILLING
DISTRICT / ARCHITECT / CONSULTANT RELATIONSHIPS
DESIGN PROCESS
UNDERSTANDING THE DESIGN
BIDDING MATERIALS
CONSTRUCTION MANAGEMENT
OPPORTUNITIES FOR OPERATIONS

BIM FOR K-12 FACILITIES


DESIGN :: LEVERAGE THE TOOLS
Increased value
Creative solutions
Better Facilities

BIM FOR K-12 FACILITIES


DURING DESIGN
DURING CONSTRUCTION
AFTER OCCUPANCY

ADVANTAGES FOR OPERATORS

BIM FOR K-12 FACILITIES


Clarity of Communication, Interaction
Coordination, Synergy
Documentation
Analysis (LEED?)

DESIGN ADVANTAGES

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES
Have you ever
received BIM documents
for a facility or remodel?

1. None
2. One
3. Several
4. Don’t Know

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: COMMUNICATION
Clear communication –
Pre-Visualization
Documented Goals

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: CONSOLIDATED GOALS

Improved quality of life


Affordable
Human Scale

Stronger community
Mixed Use Planning
Medium Density Policy Making

Social Benefits
Smart Growth

Better health
Diversity/Density
Land Use/Zoning

Energy Use
Water Distribution
Drainage
Renewable Energy Parks
Utility Parking
Bike Path
Street Network
Mass Transportation
Zero-Carbon Campus Network

Consumption/Waste
Recycling
Composting
Green Building
Local Economy LEED Certification
Green Purchasing Operation & Maintenance

BIM FOR K-12 FACILITIES


EXAMPLE :: VALIDATE FORM :: RAPID PROTOTYPING
VALIDATING DESIGN
VR Tours make design decisions accessible.
Rapid Prototypes enhance conversations about form.

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: COORDINATION

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: DOCUMENTATION
2D document review,
integrated into the model

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: DOCUMENTATION
3D clash detection and
coordination review,
based directly on the
model

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: ANALYSIS
You can Leverage the BIM Database
(if the Data is in there.)
Performance
Cost
Sustainability
Efficiency
Future extensions

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: ANALYSIS

Solar Radiation

PV Performance
Average Temperatures

Solar Envelope
Prevailing Wind
Average Cloud Cover

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: ANALYSIS
Integrated Sustainability goals and tracking
(Is BIM sustainable? Depends on how it’s used.)

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: ANALYSIS :: PROGRAM VALIDATION
Real-time feedback on
program requirements

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: ANALYSIS
True Daylighting and Artificial lighting levels
Direct from Construction Documents
Actual light fixtures and materials

BIM FOR K-12 FACILITIES


DESIGN ADVANTAGES :: ANALYSIS
Airflow
Fume Hoods
Thermal Transfer, Comfort
Acoustics

BIM FOR K-12 FACILITIES


Coordination
Just -In-Time
Schedule Tracking
Verification
Overall Efficiency

CONSTRUCTION ADVANTAGES

BIM FOR K-12 FACILITIES


CONSTRUCTION ADVANTAGES :: COORDINATION

BIM FOR K-12 FACILITIES


CONSTRUCTION ADVANTAGES :: JUST-IN-TIME

BIM FOR K-12 FACILITIES


CONSTRUCTION ADVANTAGES :: SCHEDULE TRACKING
Sequencing / Planning
Maintaining Deadlines

BIM FOR K-12 FACILITIES


CONSTRUCTION ADVANTAGES :: VERIFICATION

BIM FOR K-12 FACILITIES


CONSTRUCTION ADVANTAGES :: EFFICIENCY
Eliminate Waste
Enhance Safety

BIM FOR K-12 FACILITIES


WHAT DO YOU WANT IN YOUR DATABASE?
Inventory
Moves, Occupancy, Scheduling
Maintenance, Tracking, fulfillment
Organization, Filing, paperwork, Warranties

FACILITIES MANAGEMENT

BIM FOR K-12 FACILITIES


FACILITIES MANAGEMENT :: QUESTION
How do you manage
Facility and maintenance
information?

1. Paper, Files
2. Digital Files, Spreadsheets
3. Database
4. FM Software

BIM FOR K-12 FACILITIES


FM ADVANTAGES :: INVENTORY
What equipment, Where

BIM FOR K-12 FACILITIES


FM ADVANTAGES :: OCCUPANCY
Class Scheduling
Move Coordination
Equipment
Locations

BIM FOR K-12 FACILITIES


FM ADVANTAGES :: MAINTENENCE
Equipment
Status
Maintenance
Schedules
Warranty
Information
Parts List,
Replacement
Part Inventory

BIM FOR K-12 FACILITIES


FM ADVANTAGES :: MAINTENENCE
Equipment
Status
Maintenance
Schedules
Warranty
Information
Parts List,
Replacement
Part Inventory

BIM FOR K-12 FACILITIES


FM ADVANTAGES :: MAINTENENCE
Equipment
Status
Maintenance
Schedules
Warranty
Information
Parts List,
Replacement
Part Inventory

BIM FOR K-12 FACILITIES


FM ADVANTAGES :: DOCUMENTATION
COBIE
Construction to Operations Building Information Exchange

A Filing system for Building Documents


Plans, drawings, details
Warranty Documents
Instruction Manuals
Replacement Part Inventory
Space, System
& Equipment
Layout

Design Build Operate

Product Data,
As-Built Layout,
Tag/ Serial #,
Warranties, Spares

BIM FOR K-12 FACILITIES


FM ADVANTAGES :: DOCUMENTATION
Other Tools for managing FM Data
COBIE
Web-based FM Products
SharePoint and other document management and
workflow systems.

BIM FOR K-12 FACILITIES


HOW TO ASK FOR BIM THAT PAYS
HOW TO UTILIZE BIM DURING OCCUPANCY

HOW BIM CAN WORK FOR YOU

BIM FOR K-12 FACILITIES


ASSESS PROBLEMS / COSTS
SELECT ISSUES
PLAN
SPECIFY
VERIFY

HOW TO ASK FOR BIM THAT PAYS

BIM FOR K-12 FACILITIES


BIM FOR YOU :: QUESTION
What concern
do you think BIM may best help
solve for your school system?

1. Maintenance Costs
2. Records; Filing, Organization
3. Optimal Design
(efficiency & performance)

4. Decrease construction costs

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: COSTS
START WITH THE END IN MIND
HOLISTIC VIEW OF FACILITIES PROBLEMS / COSTS
LOOK AT OPERATIONS, WHAT ISSUES CAN YOU ADDRESS
PLAN TO USE THE DATA

SPECIFY HOW YOU WILL USE THE DATA


TO THOSE THAT WILL PROVIDE IT
VERIFY DATA DELIVERY

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: COSTS
2009 Private Sector Office Building Expense Ratios
(BOMA)

Security, 6% Admin,
Grounds, 2% 11%
Fixed Expenses,
35%
Utilities, 19%

Cleaning, 12%
Repairs, 15%

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: COSTS
Viewed over a 30 year period, initial building costs account
for approximately just 2% of the total, while operations
and maintenance costs equal 6%, and personnel costs
equal 92%.
Source: Sustainable Building Technical Manual / Joseph J. Romm, Lean and Clean Management,
1994.

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: COSTS
Energy Costs = $1/SF/year on average
30 Year HVAC System Cost

Energy
Maintenance
Replacement
Installation

Statistic: http://www.ase.org/uploaded_files/greenschools/School+Energy+Guidebook_9-04.pdf
Image: (Courtesy of Washington State Department of General Administration)

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: COSTS
A typical school district with 4,000 students
pays over $400,000 for energy-related
utilities each year. Incorporating
energy-efficient design improvements 8%
could potentially save that district over 5%
$100,000 annually, enough to pay for
three maintenance positions; 7%
replacement of gym bleachers; all roof
maintenance, repair, and replacement 48%
needs over the life of the facilities; or
annual requirements for instructional
supplies.

--US Department of Energy, "Energy Smart Building Choices" 32%


http://www.nrel.gov/docs/fy01osti/30559.pdf

(Chart) 38th Annual Maintenance & Operations Cost Study for


Schools
Apr 1, 2009 12:00 PM, By Joe Agron (jagron@asumag.com) Payroll Energy / Utilities
How the M&O budget is split
(based on median dollars per FTE student) Equipment Contract Labor
Data from the 38th Annual Maintenance & Operations Cost
Study for Schools
Other

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: PLAN
Payback: Existing Standards:
COBIE = Construction Operations
Building Information Exchange
CIS/2 = CIMsteel Integration
Standards (structural Steel Only)
Penn State BIM Delivery Standard
NIBS National BIM Standard
Did you ask for it? Your Own Requirements
AIA IPDG and E202
Model Progression Matrix

What are your capabilities? What processes will you use to


manage BIM data after
construction?
What processes will benefit?
What needs do you want to
How will you verify that
address? deliverables will meet your
needs?
Can your AEC team deliver?

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: PLAN
Process ::
BIM Planning Guide, LOD/Responsibility
Matrix, Model Coordination and
Collaboration Procedures

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: PLAN
Process ::
BIM Planning Guide, LOD/Responsibility
Matrix, Model Coordination and
Collaboration Procedures

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: PLAN
Planning Construction
Usage

BIM FOR K-12 FACILITIES


MAKE BIM PAY :: PLAN
Computer Power :: Computer Benchmarking, New Hardware Standards

Interoperability ::
Regional reference directory, configuration, installation, and unified template

Dataset Integrity ::
Training, Review Tools

Process ::
BIM Planning Guide, LOD/Responsibility Matrix, Model Coordination and Collaboration
Procedures

BIM FOR K-12 FACILITIES


OPERATIONS :: CHANGES :: CONTRACTS & BILLING

BIM FOR K-12 FACILITIES


You don't have to invest in software.
You don't have to invest in computer hardware.
You do have to have a plan.
You do have to know your data is good.

HOW TO UTILIZE BIM FOR FM

BIM FOR K-12 FACILITIES


BIM FOR FM :: CHOOSE PLATFORM
CONSISTENCY
USABILITY
FOCUSED ON GOALS

Doesn’t have to be:


Facilities Management Software
Revit

What will work?


Any ODBC Database: SQL Server, MS Access, Oracle…
Spreadsheet / Data Manipulator: Excel…

BIM FOR K-12 FACILITIES


BIM FOR FM :: SPECIFY DATA
OPERATIONAL NEEDS

MAINTENANCE CRITERIA

INDUSTRY STANDARDS

BIM FOR K-12 FACILITIES


BIM FOR FM :: SPECIFY DATA :: INDUSTRY STANDARDDS
Industry Consensus Standards
National BIM Standard http://www.facilityinformationcouncil.org/bim/
http://www.facilityinformationcouncil.org/bim/pdfs/NBIMSv1_p1.pdf
AIA http://www.aia.org/ipdg
CIS/2 http://cic.nist.gov/vrml/cis2.html
COBIE http://www.wbdg.org/resources/cobie.php

Municipal
State of Wisconsin Wisconsin DSF BIM Guidelines and Standards http://www.doa.state.wi.us/dsf/masterspec_view_new.asp?catid=61&locid=4
State of Texas Press Release and Contact http://www.tfc.state.tx.us/communities/facilities/prog/construct/
Army Corps of Engineers https://cadbim.usace.army.mil/default.aspx
GSA 3D-4D Building Information Modeling

Higher Ed
Indiana University http://www.indiana.edu/~uao/iubim.html
Penn Sate university http://www.engr.psu.edu/ae/cic/bimex/procedure.aspx

Corporate
General Motors
GAP, Target, Wal-Mart, Starbucks, Sam’s Clubs
Yum Brands

BIM FOR K-12 FACILITIES


BIM FOR FM :: SPECIFY DATA :: CHOOSE A PILOT

Indiana University BIM Capabilities Matrix


(prequalified BIM providers)

BIM FOR K-12 FACILITIES


Opportunities
to increase value
Reduce cost
improve facility performance
A Better Design Process
A Better Construction Process
Tools to manage Facilities and Maintenance
Leverage for the future

CONCLUSION

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES
THANK YOU

QUESTIONS…

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES


BIM FOR K-12 FACILITIES :: EFFECTIVE PROCESSES

BIM FOR K-12 FACILITIES


AIA, Continuing Education

“POP” QUIZ

BIM FOR K-12 FACILITIES


INTRODUCTION
The BIM acronym stands for:

1. Better Invest More


2. Building Information Modeling
3. Building Interesting Machines
4. Base Information
Management

BIM FOR K-12 FACILITIES


INTRODUCTION
To Use an Autodesk Revit
BIM Database you can
use:

1. Autodesk Revit
2. Microsoft Access or Excel
3. Revit Compatible FM Software
4. Any of the above

BIM FOR K-12 FACILITIES


INTRODUCTION
Is BIM good for sustainable
design?

1. No
2. Depends on how you use it
3. Yes, Always
4. Only when created with
recycled computers.

BIM FOR K-12 FACILITIES


INTRODUCTION
Is BIM an extra cost?

1. Depends on what the


operating definition of BIM is.
2. Depends on what the
definition of IS is.
3. Yes, Always.
4. No, Never.

BIM FOR K-12 FACILITIES


INTRODUCTION
Is a BIM a 3D Model?

1. Yes
2. No
3. Maybe

BIM FOR K-12 FACILITIES


INTRODUCTION
What do the innards of a
true BIM look most like?

1. A CAD Drawing
2. A 3D Model
3. A Relational Database
4. An Amphibian

BIM FOR K-12 FACILITIES


This concludes the AIA, Continuing Education

POP QUIZ

BIM FOR K-12 FACILITIES


2010 AIAMI EDUCATIONAL FACILITIES CONFERENCE

BUILDING INFORMATION MODELING


FOR K-12 FACILITIES

BIM FOR K-12 FACILITIES